Skip to main content

Tube 157

 Container

Contains 5 Results:

Ashton, Evans & Brazier; Addition, 1956

 File — Tube: 157
Identifier: MHT #635, CMF #424B
Scope and Contents

General Electric Supply Corp. at 312 W 300 S. Proposed and final 4th floor addition including elevations and plot plan.

Dates: 1956

Ashton, Brazier, Montmorency & Associates; Proposal Addition, 1967

 File — Tube: 157
Identifier: MHT #635, CMF #424G
Scope and Contents

Building at 328 W 300 S (behind). Plot plan showing location of new building on Keyser site.

Dates: 1967

Ashton, Brazier, Montmorency & Associates; Minor Alterations, 1968

 File — Tube: 157
Identifier: MHT #635, CMF #424C
Scope and Contents

Keyser Realty at 316 W 300 S. Primarily office space modifications.

Dates: 1968

Ashton, Evans & Brazier; Addition, undated

 File — Tube: 157
Identifier: MHT #635, CMF #424D
Scope and Contents

Flint Distribution at 320 W 300 S. New 4th floor addition to building. Includes plot plan.

Dates: undated

Ashton, Evans & Brazier; Addition, undated

 File — Tube: 157
Identifier: MHT #635, CMF #424E
Scope and Contents

Keyser Warehouse at 328 W 300 S. New façade and several floor plans.

Dates: undated