Tube 157
Container
Contains 5 Results:
Ashton, Evans & Brazier; Addition, 1956
File — Tube: 157
Identifier: MHT #635, CMF #424B
Scope and Contents
General Electric Supply Corp. at 312 W 300 S. Proposed and final 4th floor addition including elevations and plot plan.
Dates:
1956
Ashton, Brazier, Montmorency & Associates; Proposal Addition, 1967
File — Tube: 157
Identifier: MHT #635, CMF #424G
Scope and Contents
Building at 328 W 300 S (behind). Plot plan showing location of new building on Keyser site.
Dates:
1967
Ashton, Brazier, Montmorency & Associates; Minor Alterations, 1968
File — Tube: 157
Identifier: MHT #635, CMF #424C
Scope and Contents
Keyser Realty at 316 W 300 S. Primarily office space modifications.
Dates:
1968
Ashton, Evans & Brazier; Addition, undated
File — Tube: 157
Identifier: MHT #635, CMF #424D
Scope and Contents
Flint Distribution at 320 W 300 S. New 4th floor addition to building. Includes plot plan.
Dates:
undated
Ashton, Evans & Brazier; Addition, undated
File — Tube: 157
Identifier: MHT #635, CMF #424E
Scope and Contents
Keyser Warehouse at 328 W 300 S. New façade and several floor plans.
Dates:
undated