Box 32
Container
Contains 4 Results:
Correspondence, 1941-1948
File — Box: 32, Folder: 1-2
Identifier: VII
Scope and Contents
From the Sub-Series:
Material dealing with Adams' planning for remodeling and modernization of the Murray City Power Plant (diesel). The major portion of this is manufacturer's data with very little correspondence. Successful completion of this project was a major factor in award of the engineering contract to Adams for modernization of the Moon Lake Power District generating station.
Dates:
1941-1948
Plans, Specifications, and Other Contract Papers
File — Box: 32, Folder: 3-5
Identifier: VII
Scope and Contents
For improvements to Murray Power Plant (P. W. A., 1934 September 14).
Dates:
1905-1971
Manufacturer's Specifications, Blueprints, and Notes
File — Box: 32, Folder: 6-15
Identifier: VII
Scope and Contents
From the Sub-Series:
Material dealing with Adams' planning for remodeling and modernization of the Murray City Power Plant (diesel). The major portion of this is manufacturer's data with very little correspondence. Successful completion of this project was a major factor in award of the engineering contract to Adams for modernization of the Moon Lake Power District generating station.
Dates:
1905-1971
Manuals for Installation and Operation of Equipment at Murray City Power Plant
File — Box: 32, Folder: 16-20
Identifier: VII
Scope and Contents
From the Sub-Series:
Material dealing with Adams' planning for remodeling and modernization of the Murray City Power Plant (diesel). The major portion of this is manufacturer's data with very little correspondence. Successful completion of this project was a major factor in award of the engineering contract to Adams for modernization of the Moon Lake Power District generating station.
Dates:
1905-1971