Box 23
Container
Contains 13 Results:
Notes and Specifications
File — Box: 23, Folder: 25-27
Identifier: VII
Scope and Contents
From the Sub-Series:
This project involved the reconstruction and upgrading of a distribution line system in Nevada. The line ran from a substation about 15 miles south of Alamo, Nevada to a point one mile north of Hyko, Nevada, serving the community of Alamo and a number of farms and ranches in the Pahranagat Valley. Adams was project engineer through completion.
Dates:
1905-1971
Material Lists and Inventories
File — Box: 23, Folder: 28
Identifier: VII
Scope and Contents
From the Sub-Series:
This project involved the reconstruction and upgrading of a distribution line system in Nevada. The line ran from a substation about 15 miles south of Alamo, Nevada to a point one mile north of Hyko, Nevada, serving the community of Alamo and a number of farms and ranches in the Pahranagat Valley. Adams was project engineer through completion.
Dates:
1905-1971
Notes and Rough Draft of Service Contract
File — Box: 23, Folder: 29-30
Identifier: VII
Scope and Contents
From the Sub-Series:
This project involved the reconstruction and upgrading of a distribution line system in Nevada. The line ran from a substation about 15 miles south of Alamo, Nevada to a point one mile north of Hyko, Nevada, serving the community of Alamo and a number of farms and ranches in the Pahranagat Valley. Adams was project engineer through completion.
Dates:
1905-1971