Skip to main content

Box 23

 Container

Contains 13 Results:

Notes and Specifications

 File — Box: 23, Folder: 25-27
Identifier: VII
Scope and Contents From the Sub-Series: This project involved the reconstruction and upgrading of a distribution line system in Nevada. The line ran from a substation about 15 miles south of Alamo, Nevada to a point one mile north of Hyko, Nevada, serving the community of Alamo and a number of farms and ranches in the Pahranagat Valley. Adams was project engineer through completion.
Dates: 1905-1971

Material Lists and Inventories

 File — Box: 23, Folder: 28
Identifier: VII
Scope and Contents From the Sub-Series: This project involved the reconstruction and upgrading of a distribution line system in Nevada. The line ran from a substation about 15 miles south of Alamo, Nevada to a point one mile north of Hyko, Nevada, serving the community of Alamo and a number of farms and ranches in the Pahranagat Valley. Adams was project engineer through completion.
Dates: 1905-1971

Notes and Rough Draft of Service Contract

 File — Box: 23, Folder: 29-30
Identifier: VII
Scope and Contents From the Sub-Series: This project involved the reconstruction and upgrading of a distribution line system in Nevada. The line ran from a substation about 15 miles south of Alamo, Nevada to a point one mile north of Hyko, Nevada, serving the community of Alamo and a number of farms and ranches in the Pahranagat Valley. Adams was project engineer through completion.
Dates: 1905-1971