This section contains correspondence, printed material, drawings and blueprints for various power projects for which Adams was designing or consulting engineer. The material is arranged by state and project, and has then been placed in chronological sequence. Items associated with electrical power systems in general have been placed at the end of the section.
The Idaho Rural Project was a design by Adams for a power line to run from Ashton, Idaho to West Yellowstone, Montana, 1946-1953. Adams did not complete this project as his contract was terminated by the Co-op board.
The Idaho Rural Project was a design by Adams for a power line to run from Ashton, Idaho to West Yellowstone, Montana, 1946-1953. Adams did not complete this project as his contract was terminated by the Co-op board.
Dates
- 1905-1971
Conditions Governing Access
Twenty-four hour advanced notice encouraged. Materials must be used on-site. Access to parts of this collection may be restricted under provisions of state or federal law.
Extent
From the Collection: 35 Linear Feet
Language of Materials
From the Collection: English
Creator
- From the Collection: Adams, Thomas C. (Thomas Caldwell), 1901-1965 (Person)
Repository Details
Part of the J. Willard Marriott Library Special Collections Repository
Contact:
295 South 1500 East
Salt Lake City Utah 84112 United States
801-581-8863
special@library.utah.edu
295 South 1500 East
Salt Lake City Utah 84112 United States
801-581-8863
special@library.utah.edu