Skip to main content

Projects and Reports on Lost River, Idaho

 Sub-Series
Identifier: VII

Scope and Contents

From the Series: This section contains correspondence, printed material, drawings and blueprints for various power projects for which Adams was designing or consulting engineer. The material is arranged by state and project, and has then been placed in chronological sequence. Items associated with electrical power systems in general have been placed at the end of the section.

The Idaho Rural Project was a design by Adams for a power line to run from Ashton, Idaho to West Yellowstone, Montana, 1946-1953. Adams did not complete this project as his contract was terminated by the Co-op board.

Dates

  • 1905-1971

Conditions Governing Access

Twenty-four hour advanced notice encouraged. Materials must be used on-site. Access to parts of this collection may be restricted under provisions of state or federal law.

Extent

From the Collection: 35 Linear Feet

Language of Materials

From the Collection: English

Repository Details

Part of the J. Willard Marriott Library Special Collections Repository

Contact:
295 South 1500 East
Salt Lake City Utah 84112 United States
801-581-8863